Capability:

Owner: Texas Dock and Rail
Project: Phase 1 Tank farm expansion
Engineer: Engineering and Terminal Services
General Contractor: Mirage Industrial Group
Project Type: $ 6,400,000
Total Man-hours: 98,599
Status: Complete

Project Description

Mirage was called in to assist with the Expansion of an existing tank farm located on the Corpus Christi ship channel.

Work Performed
  • Installed 4 at 115 barrel tank ring foundations
  • Installed 3 100 barrel tank ring foundations
  • Installed 1 at 50 barrel firewater tank foundation
  • Placed 1660 linear foot of concrete dike wall
  • Installed 1 manifold for the 4 at 115 barrel tanks
  • Installed 7 Lact unit foundations
Accomplishment
  • Effectively completed the project with 0 recordable injuries.
  • Successfully maintained an excellent working relationship with the Texas Dock and Rail and Trafigura
Challenges

Mirage had to keep terminal up and running during installation of tank foundation with over 100 trucks off loading and loading on a daily basis