NEW 60 ACRE TANK FARM

Capability:

Owner: EF90
Project: New 60 Acre tank farm
Engineer: Engineering and Terminal Services
General Contractor: Mirage Industrial Group
Project Type: $ 5,800,000.00
Total Man-hours: 79,000
Status: Complete

Project Description

Mirage was called in to assist with the Expansion of a new tank farm located on the Corpus Christi.

Work Performed
  • Built to grade 60 Acre site
  • Installed all underground drainage
  • Installed underground firewater
  • Displaced and located 13,500 loads of general fill
  • Installed 45 catch basins to create adequate drainage
Accomplishment

Effectively completed the project with 0 recordable injuries.

Challenges

Coordinating with existing land owner to remove pipe and pipe racks in phases.