FORMOSA PLASTICS 25% IEM EXPANSION • Mirage Industrial Group

FORMOSA PLASTICS 25% IEM EXPANSION

Capability:

OWNER: FORMOSA PLASTICS
PROJECT: 25% IEM EXPANSION
Contracting Agency Address & Phone:
Formosa plastics
201 Formosa drive
Point Comfort, TX
(361) 987-7000
Amount: $941,500.00

PROJECT DESCRIPTION

MIRAGE WAS CONTRACTED BY FORMOSA PLASTICS TO ERECT IEM EXPANSION BRINE EVAPORATOR STRUCTURE

WORK PERFORMED
  • ERECTED 570,000 LBS STEEL STRUCTURE
  • INSTALLED 1100 SQUARE FEET OF Q-DECKING
  • INSTALLED 6000 SQUARE FEET OF GALVANIZED GRATING
  • POURED 35 CUBIC YARDS AT EL.60
KEY ACCOMPLISHMENTS
  • Effectively completed project with no OSHA recordable incidents or lost time accidents.
CHALLENGES
  • TYING NEW STEEL STRUCTURE INTO EXISTING STEEL STRUCTURE IN AN OPERATING PLANT WITHOUT DISTURBING PLANT OPERATIONS.